11 of 15

Lint-plugin adoption scores, before and after, for four Home and four Listing components.
Lint scores before and after: Home, Listing

Gojek · Review co-lead and impact-report author

GoFood Review

A design-system review of every category in GoFood's redesign, and the report that estimated what it was worth.

Impact

  • Across the 16 reviewed components, average design-system adoption went 83% → 99.8%, as scored by the lint plugin.
  • With the design system, the estimated build time for 4 complex components fell from 220 hours to 25 minutes.
  • After the review, 16 of 16 components scored 97% or higher, up from as low as 69% before.

The problem

GoFood's redesign was a large project to fix pain points across its main flows in the Gojek app. Close to 10 designers worked on it.

Near the end, the design-system team was asked to review every part of the redesign: Home, Listing, Promo zone and Merchant profile. The goal was to catch issues and help the GoFood team fix them before and during handoff to engineering.

What I did

I co-led the review with another design-system designer and wrote the impact report.

  • A review checklist and an issue tracker. Every issue was logged with its area and priority, so designers knew what to fix first.
  • Flow reviews with every team involved, from GoFood's designers to front-end developers and UX engineering.
  • Following the fixes through handoff, from design to the developers building them.

How I measured it

I wanted to show the system's value in terms product teams already track: adoption and hours.

  • Adoption. Our lint plugin scores a design out of 100 for how much of it is built from the system's tokens and components. We scored 4 components in each of the 4 areas, before and after the review.
  • Build time. With GoFood's front-end developers and UX engineering, we estimated build time for 4 complex components, by hand and with the system.
  • Support time. Across 40 issues raised in the support channel that quarter, a developer took about 10 minutes to raise one, and it took about 30.4 hours to resolve, on average.

Where it stands

Shipped. The fixes shipped with the redesign, and the impact report is done. The savings are an estimate of effort avoided, not measured spend. Each issue the review caught was counted as one that would otherwise have reached the support channel after handoff, at the average time to resolve. Of the estimated savings, faster builds account for 219.6 hours; the rest is support time avoided.

More results

  • The review saved an estimated 5,906 hours of build and support work.
  • The review tracker logged 186 issues for the GoFood team to fix.
  • The design-system team reviewed 7 experience flows.
  • The review involved 5 teams and functions, including GoFood's designers, front-end developers and UX engineering.
Lint-plugin adoption scores, before and after, for four Promo zone and four Merchant profile components.
Lint scores before and after: Promo zone, Merchant profile
Table of four GoFood components with approximate build times. 220 hours in total from scratch, 25 minutes with the design system.
Approximate build time for four components, from scratch and with the system

Manyu Varma

മന്യു വർമ്മ

I design and build design systems for people and AI agents: tokens, governance, release tooling, and guidelines that agents can follow.

Highlights

Work

Agentic

Early AI

Pre-AI

Hold Alt or Option to see the spacing.