The problem
Asphalt is Gojek's mobile design system, behind its consumer, driver and merchant apps. Before its core team existed, no one clearly owned it, and work on it wasn't planned or counted. Many designers outside interaction design didn't value it. Front-end developers often didn't know it, so they built custom components and used the wrong tokens.
I set up the team and how it planned
Leading the team gave Asphalt an owner, a plan, a way to measure it and a release schedule.
With a teammate, I co-wrote the team's charter and set the team up from the ground up. I later led it as a lead IC: I owned the roadmap, set the OKRs, ran the rituals and led the discussions with leadership. I was also the lead designer on hands-on projects. The team worked regularly with 5 UX and platform engineers.
- Rituals: weekly stand-ups and library updates, critiques when needed, and a UX-engineering sync every 2 weeks.
- Audits on a schedule: tokens every 6 months, master components every 3 and patterns every 2.
- A place in every project: 3 design-system touchpoints in the interaction-design workflow, 1 of them optional.
- One review flow shared by product, the design system and UX engineering, from wireframes to handoff.
I drove the team's OKR planning for 2 cycles. Focus groups with product teams surfaced the top problems, led by the process for adding new components. We turned the top problems into 6 key results and chose 4, partly by RICE scoring. Each cycle took about 3 weeks, from discovery to key results agreed with 3 business-unit leads and product managers. I also owned one key result myself, on text scaling.
Earlier, I ran focus groups on where Asphalt should go next, as part of my 2-year vision. 25 people took part, in 5 groups of 5: one from the design-system team and 4 cross-functional groups. We narrowed 18 ideas to 16 possible actions, then 5 goals.
I measured it and taught people to use it
- A usability baseline. I ran a System Usability Scale survey, and 47 people gave a mean score of 64.6, below the common benchmark of 68. Front-end engineers scored it 70.4, designers 61.8 and managers 56.7.
- Metrics. I wrote a KPI inventory of about 47 metrics in 8 groups. Some had targets, such as 80% design-system coverage. I also wrote the impact-report template the team used for its project reports.
- A dashboard proposal. My RFC proposed one dashboard for 5 data sources, from adoption to usability scores. It wasn't built; it became my key result in the next OKR cycle.
- Workshops. I taught designers to use the system in their own work. I ran an interaction-design learning class of 6 classes for 13 people across 2 teams. I ran sharing sessions on system updates for the interaction-design team, and wrote a goals, signals and metrics framework to judge each workshop.
I ran the libraries, from contribution to release, and moved them to Figma
Asphalt had two design libraries: the main library of core components, and the workshop library, a shared home for product-specific ones. Product needs move faster than any design system can always meet, so teams built components locally, often unaware of similar ones elsewhere. I maintained both libraries and wrote the processes that connected them.
The key call was opening contribution to every Gojek designer, through the workshop library instead of local project files.
- Contribution. Designers built in their product's page of the workshop library, and published after a design-system review.
- Audit and promotion. We audited the workshop library every month. When 2 or more products needed the same or a mostly similar component, it moved toward the main library: a ticket, design-system and UX-engineering reviews, then release once its code had started.
- Change. I wrote the component change SOP, 7 steps that line up UX engineering, the core team, product designers and product developers. A library update couldn't publish until its code date was known.
- Deprecation. A deprecation ran in stages over 3 to 6 months, or at once for a component with no usages. I ran 2 deprecations as the person in charge.
- Quality. My component documentation template grew to 15 sections, from overview to changelog. My component review checklist had 12 categories and about 34 criteria.
- Releases. Versioned releases with weekly release notes. My versioning doc gave each release a semantic version number.
When Gojek moved from Sketch to Figma, I co-led moving Asphalt's libraries and product files. I wrote the Figma onboarding guide and ran the onboarding workshops. By my estimate, one tool also saved $26,000+ a year in licences.
Where it stands
In use. When I left Gojek, adoption had risen in the product groups we trained, and product teams were contributing their own components.
Next
Color Tokens